Hydrocommissioning offers high velocity, automated control of air/debris removal supporting proper HVAC system start up.









Braun Intertec Geothermal Consulting

Hydrocommissioning and Hydronic System Preparation

Hydronic system preparation using our patent-pending flushing and fluid treatment technology improves HVAC system dependability.  

Dependable HVAC operationis subject to effective geothermal hydronic system preparation.  Air entrapped in the ground heat exchanger during installation is exceedingly difficult to evacuate and may permanently degrade the performance of the HVAC system.  Soils and other entrapped debris will plug strainers and increase maintenance costs.  Poor heat transfer fluid preparation may shorten the life of hydronic system components. 

High velocity pumping with precise controlis required to evacuate debris and air from hydronic piping systems while preventing damage caused by ineffective control of pressure.  Our patent- pending HydrocommissioningTM technology evacuates air and construction debris under high velocity, yet protects the hydronic system from harmful pressure waves through computerized automation, variable frequency pumping and redundant pressure relief.  High-capacity, continuously self-cleaning filtration prevents reintroduction of debris to the piping system, and air is safely and efficiently vented to the atmosphere.

Preparing a geothermal hydronic system for serviceis a complex process.  Interior piping requires chemical treatment that must not contaminate buried piping systems.  Yet, dissimilar treatment of interior and buried systems may degrade the overall hydronic system prematurely.  Proper geothermal hydronic preparation involves carefully isolated treatment of interior piping, base water demineralization, homogenized heat transfer solution preparation, and compliant disposal of waste.  Use of Braun Intertec Geothermal Hydronic System Preparation services results in interior and exterior piping systems that are properly prepared, and analytical testing in our laboratory provides evidence of regulatory compliance, water quality, inhibitor levels and freeze protection.  Wasted chemical product is minimized, captured and transported off-site for proper disposal.

Braun Intertec HydrocommissioningTM / Hydronic System Preparation Services:
  • Computer-automated, high-velocity air/debris removal utilizing patent-pending process
  • Site water demineralization, heat transfer solution blending and installation
  • Preparation of interior and exterior piping systems
  • Analytical testing of water and blended heat transfer solution quality
  • Hydronic system remediation and fine filtration of contaminated heat transfer solution
  • Heat transfer solution chemical supplier
For more information on our geothermal consulting services, please contact us.

 

in

© 2011 BRAUN INTERTEC CORPORATION | 800.279.6100 | 952.995.2000 (TWIN CITIES)

RSS Twitter Logo LinkedIn logo